After a long hiatus, Ramtech Building Systems will return to exhibit at the 80th annual Texas Society of Architects TxA Design Expo this Thursday and Friday. Jeff Ward will represent us in booth 616 at the Moody Gardens Hotel and Convention Center in Galveston. (more…)
Ramtech Building is now in full production for the manufacturing phase of the 26 non-combustible steel framed modular sections that will make up a 22,680 square foot permanent modular building for Los Alamos National Laboratory (LANL) in Los Alamos, NM. (more…)
The use of modular construction for multifamily housing projects doubled between 2017 and 2018. The main reason? Modular construction dramatically shortens the time to complete a building which reduces the cost of financing for the projects. (more…)
Ramtech Returns to Exhibit at the 2019 Texas Municipal League Conference October 9-11 in San Antonio
Ramtech will exhibit our relocatable buildings and two types of permanent modular construction in booth 910 during the 2019 Texas Municipal League annual conference and exhibition at the Henry B. Gonzalez Convention Center October 9-11 in San Antonio, Texas. (more…)
Ramtech will be back on the trade show road this week exhibiting our relocatable modular school buildings and two types of permanent modular construction at the 2019 TASA | TASB Convention at the Kay Bailey Hutchison Convention Center on Friday and Saturday September 20 and 21 in Dallas. (more…)