Tuesday, 04 February 2020 / Published in Commercial, Modular Building, Modular Construction

Roland BrownIn January Ramtech’s Vice President of Engineering Roland Brown was reelected as the Presiding Officer of the Texas Industrialized Building Code Council. (more…)

Tuesday, 21 January 2020 / Published in Ramtech News

Ramtech has publicly announced our senior level management promotions that will leverage our current corporate structure to facilitate our growth goals for relocatable modular buildings and permanent modular construction over the next decade. The key management changes include the promotions of Matt Slataper to President, Randy Van Zandt to Vice President of Operations, and Gary Davenport to Vice President of Architecture. (more…)

Wednesday, 18 December 2019 / Published in Ramtech News
relocatable modular building

Manufacturing of Relocatable Modular Building for City of Laredo WIC Program

Last week Ramtech completed the installation of a relocatable modular building for the City of Laredo Health Department’s Women, Infants, and Children (WIC) program. The new facility replaced an aging mobile home type structure at their Rio Bravo, TX location, and is the third Ramtech-built facility now in use for the city’s WIC program. The 1,792 square foot building includes space for nutrition education, consultation, lab work, office space, and waiting and break rooms. Using our traditional modular construction approach, the exterior of the building was constructed using a parapet wall design with HardiePanel cement siding and a metal mansard facia band. The interior utilizes vinyl covered gypsum walls and vinyl composition tile flooring throughout the facility. Heating and cooling of the facility is accommodated with a ducted Bard exterior wall-mounted air conditioning unit.

The federally funded WIC program provides grants to states for supplemental foods, healthcare referrals, and nutrition education for low income pregnant, breast-feeding and non-breast-feeding postpartum women. It also covers qualified infants and children up to their fifth birthday. The city of Laredo Health Department began their WIC program in 1980 and it now serves over 20,500 participants at 15 locations throughout a nine county area. The city expects the new Ramtech facility to handle a monthly caseload of up to 500 women and children.

Monday, 04 November 2019 / Published in Education, Modular Building, Modular Construction, Permanent Construction, Ramtech News
permanent modular oonstruction

Pier & Beam Permanent Modular Building for First Baptist Church at the Fields in Carrollton

Ramtech has finished our scope of work on the two permanent modular buildings that we have been building for First Baptist Church at the Fields in Carrollton. The 26,624 square foot project utilized our pier and beam permanent modular construction process to provide two education buildings as part of the church’s relocation from its previous location. The first building, a 10,624 square foot facility for adults, incorporates a central corridor with seven classrooms and men’s and women’s restroom facilities on either side. (more…)

Friday, 01 November 2019 / Published in Commercial, Modular Building, Modular Construction, Technology
modular construction concept

The Connectic modular construction system concept has been designed to be adaptable for use in a variety of environments.

An interesting article from CLAD. The Connectic idea may not see use any time soon, but it shows just how much commercial modular construction continues to draw architects and designers to embracing what’s possible through the development of relocatable and permanent modular buildings. Read about the Radical Innovation Award winning concept here.

TOP