Ramtech Receives Notice of Award from Brackett ISD
Ramtech has announced that Brackett ISD has given us a notice of award for a design-build proposal that will provide for the modular construction of an 11,616 square foot freestanding classroom wing for the District’s high school campus. Ramtech plans to employ the use of our traditional wood-framed permanent modular construction approach for a parapet wall designed facility that will incorporate a HardiePanel exterior with site applied Ultra-Crete finish. The heating and cooling will be accommodated with rooftop HVAC units mounted on a TPO covered roof. The interior floor plan will accommodate seven classrooms, two computer labs, two offices, content mastery room, an IT room, and student staff restrooms. Ramtech expects to have the project completed during March of 2015. (more…)
- Published in Ramtech News
Ramtech’s Relocatable Modular Buildings, Permanent Modular Construction, and Accelerated Building System on Display at TASB
Ramtech returns to the 54th annual TASB/TASA Convention again this year, a conference we have been participating in for over 25 years. We will be represented by both Sabrina Queen and Bill Barron who will showcase our relocatable modular buildings, permanent modular construction, and Accelerated Building System for Texas public schools in booths 831 & 833 on September 26-27 at the Dallas Convention Center in Dallas, Texas. (more…)
- Published in Ramtech News
Pedernales Electric Opens New Modular Building From Ramtech
Pedernales Electric Cooperative (PEC) has opened the new modular office building that Ramtech built for the company’s existing Marble Falls, TX site. (more…)
- Published in Ramtech News
Blue Ridge Methodist Selects Ramtech For New Modular Church Project
First United Methodist Church of Blue Ridge, Texas has approved the design portion of Ramtech’s design-build proposal for the construction of a new 10,250 square foot modular church building that will be placed on the Church’s new 18 acre site. (more…)
- Published in Ramtech News
Work Begins on Redwater ISD’s New Permanent Modular Building
The manufacturing and site preparation activities have begun on Redwater Independent School District’s new 18,348 square foot middle school facility. The new modular school building will employ Ramtech’s Accelerated Building System, a permanent modular construction process which provides for a modular building that utilizes a poured-in-place five inch concrete slab as the building’s structural floor.
The $2.7 million project will provide Redwater ISD with a new state of the art facility featuring 13 standard classrooms, three large instructional spaces with dedicated storage areas, a teachers work/break room, two student restroom groupings, faculty toilets, and a central corridor with 300 lockers. The building will incorporate a full masonry exterior, rigid panel steel roofing, and extensive window glazing. The manufacturing of the 20 module sections will be completed this week, then they will then be shipped to the job site for installation via crane-setting beginning the first week of July. Ramtech expects the design-build construction project to be completed by the middle of September.
- Published in Ramtech News