What’s The Best Delivery Method?
As a vertically integrated design-build construction company, Ramtech has been at the forefront in developing a beneficial and cost-effective D-B delivery model for commercial modular construction projects. (more…)
- Published in Modular Building
Ramtech Installing Second Modular Building For First Baptist Carrollton Church
Permanent Modular Building Installation for First Baptist Carrollton (TX) Church
With the rainy spring having eased off somewhat, Ramtech has been in the process of installing the second of two permanent modular buildings for First Baptist Carrollton. The 26,624 square foot project is utilizing Ramtech’s pier and beam permanent modular construction process that will yield two education buildings as part of the church’s relocation from its current location. (more…)
- Published in Ramtech News
Vance AFB Celebrates the Opening of New Modular Building For the 33rd Flying Training Squadron
Photo Courtesy of Vance AFB
On Thursday, June 6th a ribbon-cutting ceremony and official opening was held at Vance Air Force Base for the relocatable modular building Ramtech designed and constructed for the new home of the 33rd Flying Training Squadron. (more…)
- Published in Government
Rain or Shine Ramtech Continues Work on Modular Buildings for First Baptist Carrollton Church
Pier and Beam Foundation Concrete Pour for the Second Permanent Modular Building for First Baptist Carrollton Church
Ramtech is continuing to work through the complications of a rainy spring as we prepare the foundation for the second of two modular buildings being constructed for First Baptist Carrollton Church in Carrollton, Texas. (more…)
- Published in Ramtech News
Ramtech Receives New Modular Building Contract from Cleveland ISD
Ramtech recently received an order from the Cleveland Independent School District for the purchase of five of the our industry standard eight classroom modular school buildings. (more…)
- Published in Education