Ramtech Finishes Manufacturing and Installation of Modular Buildings for New 4-Story Barracks at Fort Sam Houston
This weekend Ramtech completed the manufacturing and installation of the modular buildings for the fifth and final phase of the MILCON Unaccompanied Enlisted Personnel Housing (UEPH) Advanced Individual Training (AIT) Barracks that will be used by the U.S. Army at Fort Sam Houston in San Antonio,Texas. The project is part of a multiple task order under an Indefinite Delivery Indefinite Quantity (IDIQ) contract that was previously awarded to the Southwest Division of Hensel Phelps Construction Co. in Austin, Texas. Ramtech was designated as a strategic subcontractor responsible for the manufacture and installation of 152 individual modular sections that are being assembled to create the four-story 272 room barracks that will total 116,480 square feet. (more…)
- Published in Ramtech News
Limestone Shares Their Experience on Using Permanent Modular Construction
Ramtech recently went back to visit our first Accelerated Building System permanent modular construction project for the healthcare market located adjacent to the main hospital at Limestone Medical Center in the central Texas community of Groesbeck. We took along our video gear to record the thoughts and comments of Penny Gray, administrator and CEO at Limestone, as she reflected on how the 12,000 square foot modular building project was originally developed and what it was like to work with the Ramtech team.
The interview took place inside the rural modular medical clinic that provides accommodations for seven physicians and an optometrist, including 20 exam rooms, four procedure rooms, medical records area, offices and retail space.
Here is what Penny had to say in her own words:
- Published in Ramtech News
A Hospital Turns to Ramtech for Permanent Modular Construction
When St. Joseph Regional Health Center decided they needed to add an urgent care facility in College Station, Texas, they chose Ramtech to become part of their project team, working with Ameritex Studio as their architect of record, and Vaughn Construction as their CM. The reason: Ramtech had a proprietary permanent modular building system that was superior to any modular system in the southwest, and Ramtech’s in-house design team was most qualified to provide a design assist engineering role. In order to lower cost, St. Joseph chose to utilize a design-build approach. This opened the door to Ramtech’s design team initiating programming sessions, conducting site investigations and developing a synergy with the client that carried forward throughout the project. (more…)
- Published in Ramtech News
Modular Buildings for Healthcare on Display at the Louisiana Rural Health Conference
On October 24th and 25th Ramtech will once again exhibit our temporary and permanent modular buildings for healthcare applications at the Louisiana Rural Health Association Conference in Baton Rouge, Louisiana. (more…)
- Published in Ramtech News
Modular Buildings on Display at IFMA World Workplace in San Antonio
From October 31 through November 1, Ramtech will be back exhibiting our temporary and permanent modular building designs at the International Facility Management Association’s World Workplace 2012 Conference and Expo at the Henry B. Gonzalez Convention Center in San Antonio, Texas. (more…)
- Published in Ramtech News