Ramtech Modular Buildings on Display at DUG Conference in Fort Worth
With the tremendous expansion of oil and gas drilling across the country over the last few years, an enormous opportunity has been created for the use of modular buildings for everything from workforce housing to administrative offices. (more…)
- Published in Ramtech News
Ramtech Hits Modular Building Institute 30-Year Milestone
At this year’s Modular Building Institute World of Modular Convention held March 21-24 at the J.W. Marriott Resort in San Antonio, Texas, Ramtech was recognized for 30 years of continuous membership and support of the MBI. (more…)
- Published in Ramtech News
Redwater ISD Approves Ramtech Proposal for New Permanent Modular Building
During their scheduled board meeting on February 24, 2014 the Redwater Independent School District’s Board of Trustees unanimously approved Ramtech’s lump sum proposal for the construction of a new 18,348 square foot middle school. The new modular school building will employ Ramtech’s Accelerated Building System, a permanent modular construction process which provides for a modular building that utilizes a poured-in-place five inch concrete slab as the building’s structural floor. The approval of the lump sum proposal now paves the way for the construction portion of the design-build project to begin.
Ramtech’s two-step approach to design-build construction provides for a fixed fee design that enables us to determine the actual construction costs. These costs are then presented to the school district in the form of a lump sum proposal. If the lump sum proposal is accepted, construction can begin. If they are rejected, then the district is only out the amount of the fixed design fee. This approach provides Texas ISD’s with a low-risk way to take advantage of one of the many benefits that design-build construction offers.
Redwater ISD’s $2.7 million project will provide them with a new state of the art facility that includes 13 standard classrooms, three large instructional spaces with dedicated storage areas, a teachers work/break room, two student restroom groupings, faculty toilets, and a central corridor with 300 lockers. The building also features a full masonry exterior, rigid panel steel roofing, and extensive glazing. Construction is slated to begin the week of March 10, with a scheduled completion in September of this year.
- Published in Ramtech News
Ramtech Enters Two Modular Building Projects For 2014 MBI Awards of Distinction Program
Ramtech is once again set to submit multiple modular building entries into this year’s Awards of Distinction program at the annual Modular Building Institute World of Modular convention and trade show being held at the JW Marriott Hill Country Resort March 21-24 in San Antonio, Texas. Ramtech will look to add to our 18 previous Awards of Distinction winners by entering two modular construction projects in the Relocatable Modular Category where we have had a lot of previous success. Last year we won first place in the Education Over 10,000 sq. ft. category with the modular school campus we built for charter school operator KIPP Delta Public Schools in Blytheville, Arkansas. (more…)
- Published in Ramtech News
Randy Van Zandt appointed Vice President of Construction for Ramtech
Ramtech is pleased to announce that Randy Van Zandt has been promoted to the position of Vice President of Construction. In his new role, Randy will be in charge of managing the day-to-day modular construction operations, all in-house construction personnel, and subcontractor relationships. He will also be responsible for developing the construction department budgets, and will work closely with our sales and estimating departments to insure that our client needs and expectations are being met. Randy will continue to report to Linc Moss, Ramtech’s President. (more…)
- Published in Ramtech News