Ramtech Building Systems To Showcase Modular Buildings at the 2016 Texas Charter Schools Conference in Austin

- Published in Ramtech News
Ramtech Completes Permanent Modular Building at Louisiana LNG Terminal Facility

- Published in Ramtech News
Ramtech Showcases Modular Buildings at the 2016 TASA/TASB Convention in Houston
Ramtech will once again be exhibiting our portable classrooms, permanent modular school buildings, and Accelerated Building System (ABS) prefabricated modular construction capabilities in booth 119 at this year’s 2016 TASA/TASB Convention being held at the George R. Brown Convention Center on September 23-24 in Houston. (more…)
- Published in Ramtech News
Ramtech Completes Work on Lifestyle Management’s Residential Reintegration Facility
Ramtech has completed the construction on the Dallas Transitional Center residential reintegration facility that we built for Lifestyle Management Inc. of Edmond, Oklahoma. Located 12 miles south of downtown Dallas, the 31,752 square foot 296 bed facility was designed, manufactured, and constructed using our Accelerated Building System permanent modular construction method. (more…)
- Published in Ramtech News
Ramtech Attends Arlington (TX) Classics Academy Charter School Groundbreaking Ceremony for New Prefabricated School Building
Ramtech was proud to play a part in the recent groundbreaking ceremony at Arlington Classics Academy for the new 37,329 square foot prefabricated school building that will located on the charter school’s eleven acre campus in Dalworthington Gardens, Texas. (more…)
- Published in Ramtech News
