More Marriott Modular
Rendering of the Marriott AC Hotel in Manhattan’s NoMad Neighborhood
The world’s tallest hotel is set to be built using modular construction in Manhattan’s NoMad neighborhood. Within five years it is estimated that 25% of all new hotel construction will use permanent modular construction as the preferred building method. Read more about it from the Bloomberg article here
- Published in Ramtech News
Have Modular Will Travel
Modular buildings are so hot they’ve even been considered for the Red Planet. A multimillion-dollar contest which was launched in 2015 by NASA challenged architectural teams to come up with various designs suitable for Mars. The goal is to provide future Mars inhabitants with permanent homes and other structures. A modular building idea from Arkansas-based Team Zoperhous, was a finalist in NASA’s Mars Habitat Design Competition. Read about it here: https://www.techtimes.com/articles/240738/20190402/nasa-announces-finalists-for-mars-habitat-design-competition.htm
- Published in Ramtech News
Storm Season is Here and Ramtech is Ready
Ramtech has over 35 years of extensive experience in mobilizing our physical and human resources to quickly and efficiently provide inventory or custom relocatable modular buildings for disaster recovery relief efforts. (more…)
- Published in Ramtech News
Ramtech Wins Three Awards of Distinction at the Modular Building Institute’s 2019 World of Modular Convention
2019 Modular Building Institute’s World of Modular Awards of Distinction Recognition
Ramtech was recognized with three Awards of Distinction honors at this year’s Modular Building Institute World of Modular annual convention and trade show in Las Vegas, Nevada. Ramtech received a First Place award in the Relocatable Modular Assembly category for the Denver International Airport Concourse A Expansion project, a 38,920 square foot Type II facility completed in 180 days which added six gates and a food concession area. (more…)
- Published in Ramtech News
Ramtech Begins Manufacturing of Modular Office Building for Dallas County Sheriff’s Department Academy
Ramtech has begun the manufacturing phase on the 25,243 square foot modular office building we are constructing for the Dallas County Sheriff’s Department Academy. Designed and developed using our slab-on-grade permanent modular construction process, the building will allow the Sheriff’s department to consolidate their training program for new recruits into one facility located 12 miles South of downtown Dallas in an unincorporated area of Dallas County. (more…)
- Published in Government, Modular Building, Modular Construction, Ramtech News