Ramtech Building Systems

Ramtech Building Systems

Ramtech Building Systems is a leading provider of modular building systems including relocatable, permanent and prefabricated constructions.

T (817) 473-9376
Email: sales@ramtechmodular.com

Ramtech Bulding Systems
1400 US Hwy 287 South Mansfield, TX 76063

Open in Google Maps
CALL (817) 473-9376
  • Home
  • Modular Construction
    • What Is Modular Construction
      • About Modular Construction
      • 20 Questions Before Building
    • Permanent Modular Construction
      • Permanent Modular Construction
      • Design Build Project Delivery
    • Relocatable Modular Buildings
      • Relocatable Modular Buildings
      • Relocatable Building Purchasing Options
  • Industries Served
    • Education
      • School Facility Types
      • School Completed Projects
      • School Floor Plans
    • Commercial
      • Commercial Facility Types
      • Commercial Projects
      • Commercial Floor Plans
    • Government
      • Government Facility Types
      • Government Completed Projects
      • Government Floor Plans
    • Healthcare
      • Medical Facility Types
      • Medical Completed Projects
      • Medical Floor Plans
  • What We Build
    • Educational Offerings
    • Portable Classrooms
    • Classroom Wings
    • Modular Offices
    • Healthcare Offerings
    • Commercial Offerings
    • Government Offerings
    • View All Facility Types
  • Floor Plans & Profiles
    • Building Floor Plans
    • Completed Project Profiles
    • SCIF Buildings
  • About
    • Ramtech Difference
    • Ramtech Story
    • Ramtech Design Team
    • Ramtech Building Systems Services
    • Ramtech Warranty
    • Ramtech Disaster Recovery
    • Awards of Distinction
    • Ramtech Blog
    • AIA Continuing Education
    • Frequently Asked Questions
    • Modular Construction Videos
    • Career Opportunities at Ramtech
  • Contact
Mike Slataper is the Founder and CEO of The Ramtech Group, Inc.

The Key to Successful Commercial Modular Construction

Monday, 30 September 2013 by Mike Slataper

cab-exteriorThere are many challenges to modular construction, especially commercial modular construction which includes both temporary as well as permanent modular buildings used for schools, hospitals, office and retail facilities.  (more…)

Read more
  • Published in Modular Construction
No Comments

Prevailing Wage Debate Hits Offsite Modular Building Sector

Wednesday, 25 July 2012 by Mike Slataper

Tom Hardiman, MBI’s Executive Director recently opened a discussion on the specter of prevailing wages being applied to offsite fabrication.  Needless to say, this posses a serious threat to the commercial modular building industry.   If the states of California, Ohio, New York, and Washington are successful in forcing prevailing wages on the modular industry it would not only be very detrimental to the industry, but also to the industries that the modular industry serves.    (more…)

Read more
  • Published in Ramtech News
No Comments

More Urban Schools Turning to Permanent Modular Buildings

Tuesday, 07 February 2012 by Mike Slataper

A month ago, I asked the following question on the “School Construction News” discussion blog:  “Have any of you used a Permanent Modular Building System to expand existing school campuses or build entire new campuses? It appears to work especially well with rural schools.”  I expected to hear primarily from small rural districts. 

Instead two large, prominent school districts, Milmont School District in Reading, Pennsylvania, and Miami-Dade School District in Florida commented that they regularly used permanent modular construction to add new campuses and expand existing ones.

While Ramtech worked in Texas with both the Arlington and Alief Independent School Districts in expanding a number of their campuses, most urban school districts throughout the Southwest do not realize that permanent modular construction is a perfect building system for expanding existing school campuses.   Ramtech has been active in school construction for over 30 years and its Accelerated Building System saves both time and money compared to traditional site construction. 

Why do districts like Houston, Dallas, San Antonio, Ft Worth, and Austin not think of modular construction as a means to expand their campuses?   The reason is simple:  When large school districts throughout the SW (with the possible exception of California) think of modular construction, they think of temporary, portable buildings.  They do not realize that permanent modular buildings can be built non-combustible, with the same concrete foundations as traditional site constructed buildings, while built to the same model building codes.  Recently, the Modular Building Institute (MBI), the trade association that supports the commercial modular industry, committed to investing both time and money on educating both architects and school districts on the benefits of permanent modular construction. 

This would aid those school districts that are working hard to get within their reduced budgets while providing high quality buildings much faster. Click here to learn more about permanent modular school construction

____________________________________________________________________________________

Mike Slataper is the Founder & Chief Executive Officer of Ramtech Building Systems, Inc.

Read more
  • Published in Ramtech News
No Comments

Does the Term “Modular Construction” Still Fit?

Thursday, 12 January 2012 by Mike Slataper

Recently there has been considerable discussion within the Modular Building Institute on the use of the term “modular”.  Some industry leaders believe that the term modular is confusing, and using it to describe both temporary and permanent commercial buildings is a mistake.  In the residential industry, modular only refers to permanent homes, while manufactured housing refers to relocatable HUD Coded homes.  In Europe, most modular companies refer to their building system as “off-site construction.” (more…)

Read more
  • Published in Ramtech News
No Comments

Modular Buildings Aid FEMA in Disaster Relief Efforts

Tuesday, 21 June 2011 by Mike Slataper

From the flooding of the Mississippi River to the tornadoes that have spawned throughout the country, the rash of weather-related natural disasters has placed enormous stress on local communities and stretched the resources of the Federal Emergency Management Agency. (more…)

Read more
  • Published in Ramtech News
No Comments
  • 1
  • 2
  • 3

Recent Posts

  • Ramtech Superintendent James Marrow Enters Retirement

    For 12 years all of us at Ramtech were blessed ...
  • Ramtech Receives Two MBI Awards of Distinction Honors at the 2025 World of Modular Convention in Las Vegas

    Ramtech added to our long collection of Modular...
  • Celebrating Our Team Members

    As a full-service design-build construction com...
  • Ramtech Attends North Texas Collegiate Academy Gymnasium Opening

    Ramtech was honored to be invited to the ribbon...
  • Celebrating Our team Members

    As a design-build construction company Ramtech ...

Archives

Recent News & Articles

  • Ramtech Superintendent James Marrow Enters Retirement

    For 12 years all of us at Ramtech were blessed ...
  • Ramtech Receives Two MBI Awards of Distinction Honors at the 2025 World of Modular Convention in Las Vegas

    Ramtech added to our long collection of Modular...

Conveniently Located to Serve Markets Across the USA


Conveniently Located to Serve Markets Across the USA

ABOUT RAMTECH BUILDING SYSTEMS

  • The Ramtech Difference
  • Ramtech Story
  • Ramtech Warranty
  • Ramtech Services
  • Ramtech Building Systems Services
  • Project Profiles
  • Floorplans
  • Ramtech Blog
  • Contact Ramtech
  • Privacy Policy
  • Terms of Use
  • Career Opportunities at Ramtech

RAMTECH INDUSTRIES SERVED

  • Education Building
    • Education Types
    • Education Profiles
    • Education Floorplans
  • Government Building
    • Government Types
    • Government Profiles
    • Government Floorplans
  • Commercial Building
    • Commercial Types
    • Commercial Profiles
    • Commercial Floorplans
  • Healthcare Building
    • Healthcare Facility Types
    • Healthcare Profiles
    • Healthcare Floorplans

RAMTECH BUILDING SYSTEMS

  • Modular Construction
  • Permanent Modular Construction
    • Design Build Project Delivery
  • Relocatable Modular Buildings
    • Relocatable Building Purchasing Options
  • GET SOCIAL
Ramtech Building Systems

© 2025 Ramtech Building Systems, Inc.

TOP