University of North Texas Selects Ramtech’s Modular Buildings for Major Construction Project
Ramtech continued to build on our recent success in the college market by securing a new $3.5 million contract to provide three new modular buildings to be located on the main campus of the University of North Texas in Denton, Texas. (more…)
- Published in Education
First Baptist Frisco Shares Some Thoughts on Their New Modular Buildings
As we continue to develop projects for other churches and faith-based institutions, we recently went back to visit our friends at First Baptist Church in Frisco, Texas to check on how their new modular church buildings were working out. (more…)
- Published in Ramtech News
Hubbard ISD Talks Ramtech and Permanent Modular Construction
After assisting the Hubbard Independent School District in lowering their original $12 million construction budget by 33% to $8 million, Ramtech provided a multi-facility project consisting of three buildings using the Accelerated Building System permanent modular construction approach. Included is a 9,856 square foot high school with six classrooms, a computer language lab, family and consumer science lab, two non-acid science labs, and a data room. The 13,440 square foot junior/senior central use wing provides three separate administration areas, a boardroom, full library, computer, business and chemistry labs, a large instructional use room, and a data room. The third building is a 6,272 square foot junior high school wing which contains four standard classrooms, two science labs, a life skills room with attached storage area, and its own data room. All of the buildings have a split-face block masonry exterior designed to match the existing school architecture. Hubbard Superintendent Randy O’Brien graciously went on camera to discuss the modular building project, and provided his insight on what it was like to work with Ramtech.
- Published in Ramtech News
Life School of Dallas Modular Building Campus in the Spotlight
Organized as a charter school, Life School serves over 4,000 students at five locations around the Dallas, Texas area. When the school decided to expand their Oak Cliff area secondary school, they chose three 7,424 square foot eight-classroom modular buildings complete with connecting deck and ramp assemblies. Purchased through the Texas Buyboard and built using traditional modular contruction, each facility includes a private office, restrooms, storage area, and individual classrooms with a computer lab in the high school building. The buildings utilize nine wall-mounted HVAC units zoned for energy efficient heating and cooling, and include factory installed 26-gauge R-panel metal siding on the exterior, vinyl composition gypsum wall coverings, and durable high traffic carpet flooring. We went back out to visit the Oak Cliff campus and caught up with Shawn Thomas, Director of Operations for the Life School. Here’s what he had to say:
- Published in Ramtech News
Ramtech Finishes Manufacturing and Installation of Modular Buildings for New 4-Story Barracks at Fort Sam Houston
This weekend Ramtech completed the manufacturing and installation of the modular buildings for the fifth and final phase of the MILCON Unaccompanied Enlisted Personnel Housing (UEPH) Advanced Individual Training (AIT) Barracks that will be used by the U.S. Army at Fort Sam Houston in San Antonio,Texas. The project is part of a multiple task order under an Indefinite Delivery Indefinite Quantity (IDIQ) contract that was previously awarded to the Southwest Division of Hensel Phelps Construction Co. in Austin, Texas. Ramtech was designated as a strategic subcontractor responsible for the manufacture and installation of 152 individual modular sections that are being assembled to create the four-story 272 room barracks that will total 116,480 square feet. (more…)
- Published in Ramtech News