To facilitate growth Ramtech designed and constructed this 6’480 square foot rural health clinic utilizing its Accelerated Building System and provided full construction services including the development of the site and installation and finish-out of the floorless modules in the northeast Oklahoma community of Stillwell. The building attached directly to the hospital via a covered corridor and features a masonry exterior and architectural standing seam metal roof. The facility is home to five physicians and includes a total of 15 exam rooms, 4 procedure rooms, medical records and billing offices.

Building & Construction Details: Permanent Modular Construction Slab on Grade

Project Size: 5,120 sq ft

Construction: SBC: Type IV, Non-Protected

Facility Use: Outpatient clinic

Description: Permanent Modular Building – Wood construction Brick veneer, architectural glass block Gabled, site installed composition roof Exposed architectural wood trusses expandable for additional rooms

Completion: 90 days

  • CLIENT Delta Rurual Medical, Rural Healthcare Clinic
  • CATEGORY
TOP