Relocatable Modular Buildings
(800) 568-9376

Leasing Options

How you finance your commercial modular building is often just as important as the construction details for how it's built. At Ramtech, we'll help you explore the different financing alternatives that can help meet your specific needs and circumstances. By utilizing modular construction, both the modular building and the site do not have to be committed on a permanent financing basis, allowing for flexible forms of financing such as:

  • Operating leases from 24 to 60 months
  • Short and long term finance leases
  • Leases with purchase options

These financing alternatives may provide you with greater flexibility in increasing the size or adding features to the modular building required for your facility addition or expansion. Through our extensive relationships with several different finance companies, Ramtech can help you find just the right financing plan to meet your needs.

 

Hubbard ISD Middle and High School Campus Expansion

Project video narrated by Randy O'Brien, Superintendant of Hubbard Independent School District in Hubbard, Texas. Ramtech provided a multi-facility project consisting of three buildings using the Accelerated Building System approach. Included is a 9,856 square foot high school with six classrooms, a computer language lab, family and consumer science lab, two non-acid science labs, and a data room. The 13,440 square foot junior/senior central use wing provides three separate administration areas, a boardroom, full library, computer, business and chemistry labs, a large instructional use room, and a data room. The third building is a 6,272 square foot junior high school wing which contains four standard classrooms, two science labs, a life skills room with attached storage area, and its own data room.