Project Delivery Methods

By using Ramtech's Accelerated Building System prefabricated construction process, we can accommodate your preferences from several different project delivery system methods that you have to choose from. In addition to our preferred option of using the Design-Build process, we can also develop your project using Construction Manager at Risk, Construction Manager Agent, and Competitive Sealed Proposal. Ramtech also offers preconstruction services including design-assist and budget input, as well as taking the role of a strategic subcontractor to your designated prime or general contractor.

 

Hubbard ISD Middle and High School Campus Expansion

Project video narrated by Randy O'Brien, Superintendant of Hubbard Independent School District in Hubbard, Texas. Ramtech provided a multi-facility project consisting of three buildings using the Accelerated Building System approach. Included is a 9,856 square foot high school with six classrooms, a computer language lab, family and consumer science lab, two non-acid science labs, and a data room. The 13,440 square foot junior/senior central use wing provides three separate administration areas, a boardroom, full library, computer, business and chemistry labs, a large instructional use room, and a data room. The third building is a 6,272 square foot junior high school wing which contains four standard classrooms, two science labs, a life skills room with attached storage area, and its own data room.